Daily maintenance, repair and inspection of small and medium-sized automatic boiler water treatment

Daily maintenance, repair and inspection of small and medium-sized automatic boiler water treatment equipment?

by:Ocpuritech     2021-06-24
Daily maintenance, repair and inspection of small and medium-sized automatic boiler water treatment equipment? Author: very cold northern winter, the need for heating boiler in the winter, prolonged use of the boiler heating boiler will find inside will form a thick layer of scale, when these small and medium scale formation would have needed to fully automatic boiler water Processing equipment to deal with. When using boiler softening equipment, we should also pay attention to some problems, including the inspection and later maintenance of the boiler and softened water treatment equipment in future work. How to maintain and inspect small and medium-sized automatic boiler water treatment equipment? 1. In the process of continuous heating of hot water, the small and medium-sized automatic boiler water treatment equipment should constantly pay attention to the progressive inspection. 2. Combining with the problems found in the roving inspection, continuous maintenance. 3. If one water meter is broken, leaking, or leaking, use another water meter to check the water level, and repair the water level in time. 4. Check whether the pressure gauge is damaged from time to time. 5. Valves for running, leaking, outgassing, and dripping should be replaced in time. 6. Safe manual venting or water discharge is tested twice a week, and automatic venting or water discharge is checked at least once every three months. 7. After the boiler is out of service, it should be handled in accordance with national requirements and using dry maintenance and wet maintenance. 8. The lubricating oil circuit of the rotating machinery is kept unobstructed, and the oil cup keeps a certain oil level. 9. Check and repair the secondary instrument and protection device. 10. Remove the dust on the boiler and boiler water softening equipment. 11. The safety valve manual deflation or water release experiment should be performed at least once a week, and the automatic deflation or water release experiment should be performed at least once every three months. And draw a red line indicating the working pressure on the dial, check it or seal it. 12. When the pressure gauge is in normal operation, flush the water trap once a week, check it at least once every six months, and draw a red line indicating the working pressure on the dial, check it or seal it. 13. High and low water level alarms, low water level interlocking devices, overpressure and overtemperature alarms, and overpressure interlocking devices should do an alarm interlocking experiment at least once a month. 14. Preparatory maintenance and experimental verification of safety accessories should be recorded in detail. 15. After the boiler is out of service, use dry maintenance or wet maintenance in accordance with relevant regulations.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...
WhatsAPP图标