What are the precautions for the installation skills of integrated industrial sewage treatment equip

What are the precautions for the installation skills of integrated industrial sewage treatment equipment?

by:Ocpuritech     2021-07-03
What are the precautions for the installation skills of integrated industrial sewage treatment equipment? Author: integrated industrial wastewater treatment equipment easy to use, small footprint, welcomed by a lot of the demand side, in order for the device to the best state for us, must do well in various aspects of equipment, installation is one of the On the one hand, there are many pipes in the integrated industrial sewage treatment equipment, which are used to connect various places. The following editor will introduce what are the precautions for the installation of the integrated industrial sewage treatment equipment. First of all, we need to dig the foundation pit. Once the pit is dug, once there is mud in the pit, we must dig another 20 or 30 centimeters deep to release the water. After that, we have to do the work to ensure the sewage in time. The processing equipment is stable after installation. The second is the installation work, we follow the actual installation drawings, pay attention to the direction, spacing and other parameters. At the same time, keep your attention level. Next, we need to check for leaks in the pipeline. Turn on the power, and be careful not to reverse the direction during this process. After the equipment is installed, the first step is to connect all the tap water pipes and wires that accompany the buried equipment. The last process is the backfilling of the integrated industrial sewage treatment equipment. When the backfilling is completed, we will install ground dosing and disinfection equipment, electric control cabinets, etc. 1. The installation of pipe flanges, welds and other connecting parts conform to the installation position and the design requirements, and must not be close to the wall and pipe frame, and the orientation is reasonable for easy maintenance. 2. The slope and slope of the pipeline installation meet the design requirements. 3. When the pipeline passes through walls, floors, and roofs, the passing position and protection measures meet the design requirements. The pipes passing through the wall and the floor are equipped with casing pipes, but the pipe welds are located outside the casing pipes. The length of the wall-piercing casing is greater than the wall thickness, and the wall-piercing casing is 50mm higher than the floor or the ground. The casing passing through the roof has a waterproof shoulder and a waterproof cap; the gap between the pipe and the casing is filled with asbestos and other non-combustible materials. 4. The quality of the flange connection conforms to the fact that the two flanges should be parallel and coaxial, the bolts can be inserted freely, the bolts are threaded in the same direction, and the leakage length is equal. 5. The valve installation model meets the design requirements, the installation position, the inlet and outlet direction are correct, the connection is firm and tight, the opening and closing are flexible, the handwheel and handle are oriented in a reasonable direction, and the valve surface is clean. The above is the introduction to the installation techniques of integrated industrial sewage treatment equipment. Pipeline installation is also very important for the normal use of the equipment. Any small problem cannot be ignored. Installation is strictly required during installation to avoid errors. , Which will cause trouble for future operation.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...
WhatsAPP图标