What are the precautions for the operation of the integrated desalination equipment after installation? Author: due to severe water shortages now, many companies have to buy the production are integrated seawater desalination plants to solve water standards. The user of the newly installed integrated desalination equipment does not know how to operate it. Blind operation will bring some unnecessary troubles. The following is a detailed introduction of everyone. 1. The installation and commissioning personnel must first open the water inlet valve and the water outlet valve, start the water in the equipment to lift the water pump, and transport the seawater from the regulating water tank to the beginning of the treatment equipment. 2. For the initial application and debugging of equipment, the manufacturer of integrated seawater desalination equipment will stop pumping water when the water level reaches 1/2 the height of the equipment, turn on the fan inlet valve, turn on the fan, and slowly open the fan outlet valve for ventilation. Contact the oxidation tank for 48 hours, pump water to increase the pump participation by 3/4 of the equipment, and then inflate the water tank for 24 hours. 3. The staff should touch the filler with their hands to see if it feels sticky. At the same time, the growth of microorganisms in the water body should be studied until the yellow-yellow biofilm grows on the filler, the seawater is continuously delivered to the equipment, and the water volume is gradually added to the designed water volume. 4. The integrated seawater desalination equipment is added to the disinfectant (chlorine tablets, etc.) in the disinfection tank as needed. The water from the second settling tank passes through the disinfectant metering tank, and the medicine is partially dissolved to achieve the purpose of disinfection. 5. After the integrated seawater desalination equipment is debugged and operated normally, the system can be activated. Since the electrical operation control cabinet adopts the PLC active control program, the operation of the water pump and the fan is switched to the effective operation state on the spot, and the program has been programmed before leaving the factory (in general, each shift), the operation does not need to be set separately.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...
WhatsAPP图标