What preparations should be made before the installation of small and medium-sized buried sewage tre

What preparations should be made before the installation of small and medium-sized buried sewage treatment equipment?

by:Ocpuritech     2021-06-21
What preparations should be made before the installation of small and medium-sized buried sewage treatment equipment? Author: With the development of modern cities, sewage problem is imminent, there are a lot of waiting for sewage treatment, which requires the use of small and medium buried sewage treatment equipment, in order to enable small and medium buried sewage treatment equipment better We need to understand what preparations should be made before the installation of small and medium-sized buried sewage treatment equipment. Let's introduce it below. 1. Reasonable selection of engineering installation design drawings Generally, in the process of engineering construction and installation, there will be a phenomenon that the design drawings do not match the actual conditions. If you want to change the design drawings at this time, it will inevitably affect the progress of the installation project. Therefore, the construction unit should work closely with the design unit to avoid delays in the construction period caused by the temporary design as much as possible, and effectively solve the problems and contradictions on the design drawings before the equipment is installed. 2. Quality inspection before the equipment leaves the factory. As we all know, it takes time to rework if there are equipment problems during the equipment installation process, which will greatly extend the construction period. From the perspective of imported equipment, they will take longer to repair than ordinary equipment. If there are equipment quality problems at the installation site, no matter what the equipment breaks during the construction period, it will cause damage to the income. In this way, where appropriate, professional technicians should be sent to conduct quality inspections on the main equipment installed and purchased. 3. Strict quality control of the civil construction in the early stage of the project. If the civil construction is too deep or too shallow during the equipment installation process, the height of the building does not match the design drawings, it will cause rework, and the progress of the project will also was delayed. Therefore, during civil construction, the size of the building must be strictly controlled, and the equipment must be positioned at the designated location to avoid possible civil rework during equipment installation. The above is the introduction of the editor on what preparations should be made before installation of small and medium-sized buried sewage treatment equipment. The work of doing the equipment is to ensure the quality of sewage treatment equipment and enable small and medium-sized buried sewage treatment equipment. The operation time is longer, and you can also learn how to check the daily use of small and medium-sized buried sewage treatment equipment, so that the equipment can always operate normally.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...
WhatsAPP图标